You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Monday, June 9th 2003, 1:34pm

German Naval Developments, Q1/21

[SIZE=3]German Naval Developments[/SIZE]

A. Industrial Allocation

8/11 factories to naval materials; 8,000 t created, 650 of which is stockpiled

2/11 factories (committed) to infrastructure development

1/11 factories (non-committed) to infrastructure development; total 0.3 infrastructure points produced

B. Infrastructure Development

0.3 pts are used to start a Type 1 DD at Cuxhaven

C. Naval Construction

At Wilhelmshaven

1 Type 2 drydock: CL Nymphe begins refit; receives 900 tons; refit to complete /21
1 Type 1 slip: idle
1 Type 0 slip: idle
1 Type 0 slip: idle
1 Type 0 drydock: idle

At Bremerhaven

1 Type 2 slip: idle
1 Type 1 slip: idle
1 Type 1 drydock: idle
1 Type 0 slip: idle

At Cuxhaven

1 Type 3 slip: idle
1 Type 3 drydock: BB Markgraf receives 3,000 t; repairs to be completed 8/21
1 Type 2 slip: idle
1 Type 1 slip: idle
1 Type 0 slip: idle

At Kiel

1 Type 2 drydock: PD Hannover begins refit; receives 2100 t; refit to complete 5/21
1 Type 1 slips: idle
1 Type 1 drydock: idle
2 Type 0 slips: idle
1 Type 0 drydock: idle

Commericial shipyards build three 150 t coastal minesweepers.

D. Transactions

As per the Kobe Protocol, 1,000 t of warship material are delivered to Japan as compensation for the loss of the Augsburg. This material will be available on 1/4/21. In total, Germany owes 4,000 t of material to Japan.

E. Other Notes

The Reichsmarine reports that a new light cruiser class is to start production in Q2/1921.

As the refits to Hannover include modification of her secondary battery, the revised datasheet will be posted separately.

F. Updated Order of Battle, 31/3/21

Note: X(Y)+Z = completed (under repair/refit) + under construction

BB: 3(1)+0
PD: 3(1)+0
CL: 8(1)+0
DD: 24

Note: PD = pre-dreadnought