You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Saturday, April 2nd 2005, 2:31am

Denmark, Quarter 1, 1927

Danish Naval Developments Q1 1927

a/ Industrial Allocation
8/10 factories producing materiel for shipbuilding =8000 tons
2/10 factories (fixed) producing infrastructure materiel =0.2 bonus pts
0/10 factories producing infrastructure materiel = 0.0 points

b/ Infrastructure Development
Factory no. 11 continuing construction, receives 0.2 points = Total 7.7 points

c/ Naval Construction
Copenhagen-
No.1 type 3 slip – Vali, BB, laid down 15/01/27, receives 2005 tons, balance 22,976
No.2 type 2 slip – Budbringer, CLL, laid down 01/07/26, receives 899 tons, balance 2,047 tons
No.3 type 1 slip – Idle
No.4 type 1 slip - Idle
No.1 type 2 drydock – Thor, breaking
Dock side – Idle

Aarhus-
No.1 type 3 slip – Tyr, BB, laid down 02/01/27, receives 2005 tons, balance 22,976
No.2 type 2 slip – Udsending. CLL, laid down 02/01/27, receives 899 tons, balance 2,946 tons
No.3 type 1 slip – Idle
No.4 type 1 slip – Idle
No.1 type 3 drydock – Hoenir. CLL, laid down 01/07/26, receives 899 tons, balance 1,148 tons
No.2 type 2 drydock – Odin, breaking
Dock side – Idle

Aalborg-
No.1 type 1 slip – Musvage, DD, laid down 02/01/27, receives 539 tons, balance 1,432 tons
No.2 type 1 slip – Caracara, DD, laid down 02/01/27, receives 539 tons, balance 1,432 tons
No.3 type 0 slip – Idle
No.4 type 0 slip - Idle
Dock side – Idle

Bangkok-
No.1 type 1 slip – Orn, DD, laid down 02/01/27, receives 450 tons, balance 1,521 tons
No.2 type 0 slip – Idle
No.3 type 0 slip – Idle
No.1 type 2 drydock –Idle
Dock side – Idle

d/ Transactions
None

e/ Other Notes

KDM UD 5 continues sea trials until 03/05/27
KDM UD 6 continues sea trials until 03/05/27
KDM UD 3 continues sea trials until 03/06/27
KDM UD 4 continues sea trials until 03/06/27
KDM UD 7 continues sea trials until 03/06/27
KDM UD 8 continues sea trials until 03/06/27
KDM Lydumaa commences sea trials on 31/01/27
KDM Hoveraa commences sea trials on 31/01/27

Breaking of the following ships:-
Thor, 11,969 tons, starts 02/01/27, 1795.35 tons reusable after 31/01/28
Odin, 11,969 tons, starts 02/01/27, 1795.35 tons reusable after 31/01/28

Tonnage from scrapping = 0 tons
Tonnage Carried Over From This Quarter = 442 tons

f/ Order of Battle
Note: X(Y)+Z = In Service (under repair/refit) + building/on order (breaking)

BB = 01 (0) + 2/0 (0)
AC = 00 (0) + 0/0 (2)
CDS = 00 (0) + 0/0 (0)
CA = 02 (0) + 0/0 (0)
CL = 09 (0) + 3/0 (0)
CV(X) = 01 (0) + 0/0 (0)
DD = 17 (0) + 3/0 (0)
FR = 00 (0) + 0/0 (0)
SL = 03 (0) + 0/0 (0)
GB = 11 (0) + 2/0 (0)
TB = 19 (0) + 0/0 (0)
STC = 48 (0) + 0/0 (0)
SUB = 13 (0) + 6/0 (0)
MWS = 07 (0) + 0/0 (0)
AMC = 01 (0) + 0/0 (0)

Note: FR = Frigate
SL = Sloop
GB = Gun Boat
STC = Small Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)

Edited to correct minor tonnage discrepancies