You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Monday, October 8th 2007, 1:44am

Colombia Q2/35

Columbia

A. Industrial Allocation

2/4 factories (non fixed) to naval materials: 2,000 tons created for Q2/1935 + 0 tons stockpiled from Q1/35

Total warship materials: 2,000

1,565 tons used for ship building, 435 tons stockpiled for next quarter.

1/4 factory's (fixed) to infrastructure development: 0.1 points for Q1/1935
1/4 factory's (non fixed) to infrastructure development: 0.1 points for Q1/1935


Total: 0.2 infrastructure points created for Q4/34

B. Infrastructure Development

0.2 points added to new type 0 slip at Cartagena

C. Naval Construction

Cartagena:
Class 3 Slip #1 - completed
Class 2 Slip #1 - Idle
Class 1 Slip #1 - DD San Marcos laid down, 1,583 tons needed, 400 tons used, 400 tons added
Class 1 Slip #2 - DD San Martin laid down, 1,583 tons needed, 400 tons used, 400 tons added
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
Class 0 Slip #5 - begins construction, 0.2 points added
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle


Buenaaventura:
Class 2 Slip #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - idle
Class 0 Slip #4 - Idle
Class 3 Drydock #1 - Idle
Class 0 Drydock #1 - Idle


Launched ships being completed:

None

Ships completed/transfered and on trials

None

Building summary

2xSan Onefre class DD's building (800 tons)

D. Transactions

315 tons transfered to Atlantis for modified Zerberus class CLAA plans, 1,315 tons already transfered, transaction complete
450 tons transfered for 24 subchasers, 2,220 tons needed, 1,770 tons already transfered, transaction complete.


E. Other Notes

None

F. Miscellaneous Works

None

F. Updated Order of Battle, 10/1/34

Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.

Battleships:................................0(0)0
Pre dreadnoughts:.......................2(0)0
Armoured Cruisers:.....................2(0)0
Light Cruisers.............................2(0)0
Destroyers:.................................8(0)2 * In Atlantis
Torpedo boats:............................5(0)0
escorts:......................................0(0)0
Gunboats:..................................6(0)0
River Gunboats...........................2(0)0
Submarines:...............................0(0)0
Patrol vessels:............................1(0)0 Armed Tug Jose Felix Ribas
Mine warfare ships:.....................0(0)0
Sub chasers:.............................0(0)12 *type 4's building in Atlantis +*12 type 2's purchased
Motor Gun Boats:......................25(0)5
Motor Launches:........................5(0)0
Motor Torpedo boats:.................40(0)0
Coastal Motor Torpedo Boats:....40(0)0 * purchased from Atlantis
Depot ships:..............................0(0)0
Auxillary's:................................0(0)0