You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Sunday, October 28th 2007, 11:59pm

Denmark, Quarter 3, 1934

Danish Naval Developments Q3 1934

a/ Industrial Allocation
8/11 factories producing materiel for shipbuilding = 8000 tons
3/11 factories (fixed) producing infrastructure materiel =0.3 pts
0/11 Factories producing infrastructure materiel = 0.0 points

b/ Infrastructure Development
Drydock No.1 (Type 0) Former Siamese site at Phuket commences extension to Type 1, receives 0.1 IP point, balance 0.7 IP points
Drydock No.1 (Type 0) at Berbera, continues construction, receives 0.1 IP point, balance 0.2 IP points
Drydock No.1 (Type 0) at St.Thomas, continues construction, receives 0.1 IP point, balance 0.2 IP points

c/ Naval Construction
Copenhagen-
No.1 type 3 slip - Idle
No.2 type 2 slip - Idle
No.3 type 1 slip  Odysseus, DD, laid down 02/04/34, receives 536 tons, balance 884 tons
No.4 type 1 slip - Teucer, DD, laid down 02/04/34, receives 536 tons, balance 884 tons
No.1 type 3 drydock  Magni, CV, reconstruction started 01/08/34, receives 1701 tons, balance 17441 tons
Dock side - Idle

Aarhus-
No.1 type 3 slip  Idle
No.2 type 2 slip  Idle
No.3 type 1 slip  Toki, DD, laid down 02/10/33, receives 348 tons to complete
No.4 type 1 slip  Hemingr, DD, laid down 02/10/33, receives 348 tons to complete
No.1 type 3 drydock  Modi, CV, reconstruction started 01/08/34, receives 1701 tons, balance 17441 tons
No.2 type 2 drydock - Idle
Dock side  Idle

Aalborg-
No.1 type 1 slip  Robin Hood, DD, laid down 02/10/33, receives 348 tons to complete
No.2 type 1 slip  Legolas, DD, laid down 02/10/33, receives 348 tons to complete
No.3 type 1 slip - Idle
No.4 type 1 slip - Idle
No.5 type 1 slip  Protector, CDS, laid down 01/07/1934, receives 1307 tons, balance 8,546 tons
No.6 type 1 slip - Sentinel, CDS, laid down 02/01/1934, receives 1307 tons, balance 5,932 tons

Dock side - Lancer (l), DDL, laid down 02/10/33, receives 400 tons to complete
Dock side - Lancer (m), DDL, laid down 02/10/33, receives 400 tons to complete
Dock side - Lancer (n), DDL, laid down 02/10/33, receives 400 tons to complete


Phuket-
No.1 type 0 drydock - EXTENDING
No.2 type 1 drydock - Idle

Berbera-
No.1 type 0 drydock  BUILDING

St. Thomas-
No.1 type 0 drydock  BUILDING

d/ Transactions
None

e/ Other Notes
KDM MTC028- MTC036 commission on 30/06/1934
KDM Eias continues sea trials until 17/11/1934
KDM Toki commences sea trials on 26/08/1934
KDM Hemingr commences sea trials on 26/08/1934
KDM Robin Hood commences sea trials on 26/08/1934
KDM Legolas commences sea trials on 26/08/1934
KDM Lancer (l) commences sea trials on 15/09/1934
KDM Lancer (m) commences sea trials on 15/09/1934
KDM Lancer (n) commences sea trials on 15/09/1934

KDM D5  D8 completes scrapping on 10/09/1934

Tonnage from scrapping = 603 tons (D1  D4)
Tonnage Carried Over From This Quarter = 1049 tons

f/ Order of Battle
Note: X(Y)+Z = In Service (under repair/refit) + building/on order (breaking)

BB = 02 (0) + 0/0 (0)
CDS = 00 (0) + 2/0 (0)
CA = 03 (0) + 1/0 (0)
CL = 22 (0) + 0/0 (0)
CV = 00 (0) + 2/0 (0)
CV(X) = 01 (0) + 0/0 (0)
DD = 29 (0) + 9/0 (4)
SL = 16 (0) + 0/0 (0)
FR = 00 (0) + 0/0 (0)
GB = 33 (0) + 0/0 (0)
TB = 19 (0) + 0/0 (0)
STC = 48 (0) + 0/0 (0)
MTC = 36 (0) + 0/0 (0)
SUB = 19 (0) + 0/0 (0)
MWS = 15 (0) + 0/0 (0)
AMC = 01 (0) + 0/0 (0)

Note: FR = Frigate
SL = Sloop
GB = Gun Boat
STC = Small Torpedo Craft
MTC = Medium Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)